Skip to content
Booking lot visits for the next building season. Your permit sets the start date.
Monday – Friday: 7:30 a.m. – 4:30 p.m.General Building Contractor (B) · HI License # 000000VerifyGeneral liability and workers' compensation
1 more license
  • General Building Contractor (B) · HI License # 000000Verify
  • General liability and workers' compensation
(808) 555-0103
Screened porch with a wood ceiling, three ceiling fans and a dining table overlooking a green yard

Ohana units, ADUs and conversions on Oahu

An ohana unit runs on two clocks: the permit and the container.

Hashimoto Ohana Builders builds second homes, garage conversions and in-law suites for Oahu families who share a roof across generations. Before you sign, we put both clocks on paper: when the city is likely to answer, and when your windows, trusses and cabinets can reach the island.

  • A written permit path before any contract
  • Licensed and insured for building work in Hawaii

Clock one: the permit

The permit path, in six steps

Every ohana unit and ADU follows the same road. What changes is how long each stop takes on your lot, so we write the road down with a range for each step and a name beside it.

  1. 01
    Before drawings

    Step 1: Lot check

    We pull the parcel: zoning, lot size, access for a truck, utility lines, flood and shoreline zones, and the age of the house. You learn what can be built before you pay for drawings.

  2. 02
    Weeks 2 to 8

    Step 2: Drawings

    A site plan and floor plan drawn to your lot, with structure, fire access and wastewater shown. You see the unit's door and the path to it.

  3. 03
    Weeks 6 to 14

    Step 3: Utility sign-offs

    Water service, sewer or a wastewater system, and electric service each have their own office and their own queue. We start them early because they run side by side.

  4. 04
    Weeks 10 to 30

    Step 4: City review

    The plans go to the Department of Planning and Permitting. Comments come back, we answer and resubmit. This is the one stop neither of us controls, so we say so up front.

  5. 05
    At approval

    Step 5: Orders and site prep

    Long-lead items can be ordered at your risk before approval, or held for the permit. We lay out which is which and what a plan change would cost you.

  6. 06
    Months 1 to 5

    Step 6: Build and inspections

    Foundation, framing, roofing, rough work, inspections and finish, in the order the inspector needs to see them, then the final sign-off.

Sample content.

A sample schedule. Your lot and the city's queue set the real one, and the written version comes before any contract.

Clock two: the container

What comes by sea, and when to order it

Almost everything in a house reaches Oahu by ocean freight. The boat is the short part. Making the item, waiting for a booking and getting it from the harbor to your lot are the long parts.

Made to order, shipped in a container

Ordered from the plans, so it can't start until the plans are final.

  • Windows and sliding doors

    Typically 10 to 14 weeks

    Sizes come off the permit set.

  • Kitchen cabinets

    Typically 8 to 12 weeks

    Built after the layout is signed.

  • Roof trusses and engineered beams

    Typically 6 to 10 weeks

    Engineered to your plan and wind rating.

Stocked on the island, but tied to the boat

Often on a shelf, sometimes not.

  • Framing lumber and plywood

    Typically 1 to 3 weeks

    Treated for termites where the plans call for it.

  • Flooring and tile

    Typically 2 to 6 weeks

    Common styles on hand, specials by order.

Made here

No container to wait for.

  • Concrete, rebar and site work

    Days, not weeks

    Scheduled around the pour and the inspector.

Sample lead times, counted from order to your lot. We confirm each one on your written quote, because mills and sailing schedules change.

Who it's for

Built for the household, not just the lot

Most of our calls start with a family decision: a parent who shouldn't live alone, an adult child coming home, a cousin's family that needs a place. The unit has to work for the people who will live in it.

What we draw first

  • A step-free path from the driveway to the unit's own door

  • A bath with room for grab bars and a shower you can walk into

  • Its own entry, kitchenette and bath, with a door that closes

  • A plan for who lives where as the household changes

Accessible bathroom with a fold-up grab bar beside the toilet and a floating vanity

What we build

Five ways to add a home to a lot

Each has its own permit questions and its own shipping list. Pick the one that sounds like your lot, or ask us which fits.

After move-in

What families tell us afterward

“My mother moved into the unit behind the house last spring. The permit took longer than the build, and Aiko told us that at the first visit.”

Betsy K.Detached ohana unit

“The lead-time sheet is the page I kept. When the windows slipped two weeks, we already knew which jobs could move around them.”

Hai T.Garage conversion

“They talked to my parents about the step at the door before they talked about the kitchen. That told me they were building for them.”

Gabrielle N.In-law suite

Sample reviews.

Where we work

Urban Honolulu, Leeward Oahu and the North Shore

We build on Oahu only. The same crew and the same permit coordinator follow your job from the lot check to the final inspection.

White ranch house with a low wood deck and a stepping-stone path across a green lawn

Urban Honolulu

  • Kalihi
  • Liliha
  • Alewa Heights
  • Moanalua
  • Salt Lake
  • Waikiki
  • Ala Moana
  • Wilhelmina Rise

East Oahu

  • Kuliouou

Leeward and Central Oahu

  • Waikele
  • Waipio
  • Makakilo
  • Waianae
  • Nanakuli

North Shore and Windward

  • Waialua
  • Laie

We don't build on the neighbor islands. Each has its own permit office and its own freight schedule, and a crew that has to fly changes the price and the calendar.

Questions

What families ask first

Can I build a second unit on my lot?

It depends on your zoning district, lot size, access, utilities and the rules in force when you apply. We check all of it against your parcel at the lot visit and write down what we find. You should confirm the answer with the Department of Planning and Permitting.

Why does the permit take longer than the building?

City review runs in rounds: plans go in, comments come back, we answer. The building is a sequence we control. Review is a queue we don't, so the schedule gives it a wide range.

Can I order windows before the permit is approved?

Yes, at your risk. If the plans change in review, an item made to the old size is yours. We list which items are worth the risk and which aren't.

Can I rent the unit?

Rules for long-term and short-term rental differ and have changed. We won't plan a unit around rental income. Ask us what your lot allows, and confirm it with the city.

My house was built before 1978. What changes?

If your house was built before 1978, the EPA's lead-safe rule covers paid work that disturbs paint, with narrow exceptions for minor repairs and none for window replacement or demolition. We test or assume lead, set up containment and clean up to the rule. Ask us how it applies to your job.

Start here

Tell us about the lot and who it's for

A lot visit is an hour at the house: measurements, photos and questions. A written permit path and a lead-time sheet follow, and you decide after.

Hours
Monday – FridayToday
7:30 a.m. – 4:30 p.m.
Saturday and SundayToday
Closed
What are you thinking of?

We use what you send only to reply and to prepare the visit.