Permits and utilities

One job, not five offices

A second dwelling touches the city's planning and building review, the water system, the sewer or a wastewater system, and the electric service. We run them as one job so that nothing waits on a form nobody sent.

What we don't do: we don't promise a permit date, and we don't file anything in your name without your signature.

What we handle for you

  • A lot check against zoning, access and utilities

  • Site and floor plans drawn to your lot

  • Plans filed with the Department of Planning and Permitting and answers to each round of comments

  • Water, wastewater and electric applications started early and tracked

  • Inspections scheduled in the order the work needs them

Lumber wall studs framed on a foundation against a blue sky

What changes the cost

What the paperwork's price follows

Permit work is a service in the estimate, not a surprise at the end.

  • Drawings

    A simple unit needs fewer sheets than one with a stair, a structural change or a special lot.

  • Engineering

    Wind, soil and structure may need an engineer's stamp.

  • Review rounds

    Each round of comments takes time. A clean set of plans takes fewer.

  • Fees

    The city and the utilities charge their own fees. The estimate lists them as pass-throughs.

  • Special lots

    Shoreline, flood and historic areas add reviews of their own.

  • Your own time

    Some forms need the owner's signature. We say which, and when.

We print no figures here. The written estimate lists each of these for your lot.

How it goes

Who does what on the permit path

The owner signs, we prepare and track.

  1. 01
    Owner

    Step 1: You

    Sign the applications and the owner's statements, and send us any papers about the lot you already have.

  2. 02
    Hashimoto Ohana Builders

    Step 2: Aiko and Lito

    Aiko is the licensed contractor on the permit. Lito, the permit coordinator, files and tracks each application.

  3. 03
    Agencies

    Step 3: The city and the utilities

    Review the plans, comment, approve and inspect. We can ask for speed. We can't buy it.

  4. 04
    Specialists

    Step 4: The engineer and the designer

    Stamp the structure and draw the plans. We pick them with you.

Sample content.

Permits and rules

The offices a new unit meets

Names change and so do the rules, so the owner confirms each.

  • Planning and building review

    The Department of Planning and Permitting reviews zoning, plans and inspections.

  • Water

    The Board of Water Supply decides whether the new unit needs its own meter or lateral.

  • Sewer or wastewater

    The city sewer, or the Department of Health for a septic or other individual wastewater system.

Questions

Questions about permits

Do I need an architect?

Not always. For a simple unit, a licensed designer or engineer may be enough. We tell you which at the lot visit.

Can you promise a permit date?

No. Nobody can. We give a range from experience, tell you where the queue is when we file, and update you at every round.

What if the city asks for changes?

We answer and resubmit. If a change alters the price, we write it up before we spend anything.

Do I sign the permit?

The owner signs the owner's parts. Our licensed contractor signs the contractor's parts. We explain each before you sign.

Start with the lot check

The lot check is the first step on the permit path. Send us the parcel and we'll tell you what to ask the city.